Bathroom renovation in Rotterdam, delivered ready to use
Renovating a bathroom involves almost every trade: demolition, drainage, water supply, electrics, tiling, plastering and fitting. Ideal House carries out every one of those steps itself, in the right order and on a single schedule. You never have to coordinate a plumber, tiler and electrician yourself.
- Free survey
- Fixed price up front
- Our own craftsmen

What's included
- Complete demolition and removal of the old bathroom
- New water supply, drainage and waste pipes to current standards
- Electrics, lighting, mirror heating and sockets
- Wall and floor tiles, including walk-in shower and shower drain
- Waterproof membrane and sealing tape under the tiling
- Fitting of sanitary ware, vanity, taps, radiator and glass screen
Good to know
You can tell a good bathroom by its details: a shower floor that falls precisely to the drain, tiles in perfect alignment and clean sealant lines. But the most important work is hidden behind the tiles. That is why we pay close attention to waterproofing, pipework and falls, so your bathroom stays free of leaks and damp for years.
Whether you choose a walk-in shower with glass screen, a bathtub, a wall-hung toilet or a vanity unit with illuminated mirror, we help you find a layout that works in everyday use. Even in small Rotterdam bathrooms and under sloping attic roofs, we get the most out of the space.
How we go about it
- 01
Site survey
We measure the room, discuss your wishes and assess the existing pipework.
- 02
Design and quote
You receive a layout and an itemised quote with a clear price per item.
- 03
Execution
Demolition, installation, tiling and fitting. Usually within 10 to 15 working days.
- 04
Handover
We inspect the bathroom together, clear everything away and leave it spotless.
Work we have delivered
Frequently asked questions
How much does a bathroom renovation cost?
That depends on the size, whether pipes need to be moved and which tiles and sanitary ware you choose. After the site survey you receive an itemised quote with a fixed price per item, so you know exactly where you stand.
How long will I be without a bathroom?
A complete bathroom takes 10 to 15 working days on average. The quote states a concrete lead time, so you can arrange a temporary solution in advance if needed.
Can you renovate just the toilet?
Yes. We also carry out toilet renovations as a separate job, including concealed cistern, tiling, hand basin and lighting. As it is a smaller project, it is finished sooner.
Also useful for your project
-
02
Extensions
More space without moving house, from foundations to roofing and finishing.
-
03
Interior & exterior painting
Smooth interior paintwork and durable exterior maintenance painting.
-
04
Tiling & masonry
Perfectly aligned tiling and expert brickwork, down to the last joint.
Your bathroom renovation in good hands?
Tell us about your plans. We visit for a free survey and you receive a no-obligation quote, usually within two working days.



